Hello, all.
I’m trying to see if we will be able to make it up to Schilthorn during our Wengen stay in late May this year. I’m attaching the maintenance schedule from their site but I’m unclear what it means. Can we still go? Get to the restaurant, James Bond experience etc? It looks like the airway cableway is ok but not the funicular. Are both required to get up and back?
Thanks so much!
Maintenance
Aerial cableway Stechelberg – Mürren – Schilthorn
Spring: 24.04. – 28.04.2023
Autumn: 13.11. – 8.12.2023
Spring: 22.04. – 26.04.2024
Autumn: 11.11. – 6.12.2024
Funicular Mürren - Allmendhubel
Spring: 11.04. – 9.06.2023
Autumn: 16.10. – 8.12.2023
Spring: 8.04. – 7.06.2024
Autumn: 21.10. – 6.12.2024